Clerestory restoration means working forty feet up on scaffolding that has to come down every evening for services, which turns a straightforward six-week restoration into a two-winter project. Roughly a third of the original glass was too degraded to save and was replaced with new glass hand-matched to the surviving panels — the rest was cleaned, releaded, and reset exactly where it had sat since the nineteenth-century restoration.
The Long Nave
Six clerestory lights restored over two winters, scaffolded forty feet up — our largest single restoration to date.
- Dimensions
- 4.2m × 1.4m (×6)
- Glass pieces
- 2,850
- Technique
- Leaded came, hand-painted faces
- Installed at
- Cathedral clerestory, Lincoln
- Client
- Church
- Completed
- 2024